Who contracts and owes

Which business owns the customer promise, the invoice and the risk?

Illustrative examples only. These are possible commercial arrangements, not current offers, agreed pay, promised work, forecasts, or evidence of customer results. All amounts are USD, before tax.

Choose a chapter
  1. The proposed network economy
  2. Why a customer pays
  3. Where work starts
  4. Who funds the pursuit
  5. Who contracts and owes
  6. How each role earns
  7. Inside one project fee
  8. When the cash arrives
  9. What repeats
  10. More ways to contribute
  11. Can the whole system earn?

The prime changes the financial boundary.

A customer may contract with Intent, an independent firm or a provider’s integrator. The selected prime owns the customer promise; each subcontract owns its defined package. A separate-scope arrangement is also possible when the customer knowingly manages the interfaces.

Compare the examples below as different scopes. The independent and integrator examples show Intent’s supplier invoice—not those primes’ entire customer deals. Different amounts do not imply that one contracting route is more profitable for the same work.

A relationship becomes an accountable project

An independent firm reopens a dormant customer conversation. The customer chooses Intent as prime for one defined workflow deployment.

Buyer / budget holder
An operations leader with a bounded workflow problem
Who pays this invoice
The customer pays Intent under this project’s agreement
Ledger boundary
Intent as the selected project prime
Period covered
One eight-week delivery engagement, including authorized pursuit work

Customer value: One accountable delivery lead, acceptance evidence and an operating handover. The budget buys specified work; it does not prove a dollar return for the customer.

The baseline assumption

Example · USD · not an offerStandalone example
Fees become contribution, not take-home payIllustrative contract fee of $80,000 less Selling and discovery $11,200, Delivery and assurance $44,960, Vendors and administration $3,600 produces contribution of $20,240; Contribution is before central overhead and tax. A positive budget does not guarantee available cash.ILLUSTRATIVE ECONOMICSFees become contribution, not take-home payContracted-fee budget · full collection assumed · USDUSD020k40k60k80k80000Contract fee−11200Selling and discovery−44960Delivery and assurance−3600Vendors andadministration20240ContributionContribution is before central overhead and tax. A positive budget does not guarantee available cash.
$80,000 in illustrative fees minus $59,760 in listed costs leaves $20,240 before central overhead and tax. This is not company profit or personal income.
Fees less listed costs
$20,240
After a proposed $4,000 cash designation
$16,240

Reserve is not an expense or an extra payment to a participant. A negative remainder means this model cannot fund that reserve from its contribution. Fees do not establish accounting recognition or cash collection.

Show the full fee and cost ledger
Illustrative fees / billings within this business boundary
ScopeQuantity × rateAmount
Defined workflow deployment1 scope × $80,000$80,000
Who could earn what, for which work, and when payment is due
Work / recipientQuantity × rateBusiness invoice / costEarned whenPayment trigger
Relationship development and stewardship
Independent steward business
24 hours × $100$2,400Authorized account work completedApproved monthly invoice
Qualified opportunity success event
Independent steward business
1 event × $400$400Agreed opportunity closes and first customer payment clearsWithin agreed period after that event
Discovery and business case
Discovery specialist business
24 hours × $110$2,640Accepted discovery evidenceMilestone invoice
Presales architecture and proof
Architecture specialist business
32 hours × $130$4,160Authorized proof deliveredMilestone invoice, whether or not a later expansion sells
Procurement and commercial close
Commercial specialist business
16 hours × $100$1,600Authorized procurement work completedApproved invoice
Accountable engagement lead
Delivery lead business
48 hours × $120$5,760Accepted delivery-management workMonthly invoice
Engineering execution
Engineering firm
360 hours × $80$28,800Agreed implementation milestones acceptedMilestone invoices
Independent assurance
Assurance specialist business
64 hours × $75$4,800Review and test evidence deliveredMilestone invoices
Operations, adoption and handover
Operations specialist business
40 hours × $90$3,600Runbook and adoption work acceptedHandover invoice
Model, cloud and project tools
Technology vendors
1 project allowance × $1,800$1,800Metered consumption or licensed periodVendor billing cycle
Permitted reusable component maintenance
Component maintainer business
1 package × $2,000$2,000Agreed maintenance and usage rights suppliedAgreed milestone
Project administration allocation
Project administration function
24 hours × $75$1,800Project-specific administration performedBudgeted as incurred

Unpriced rework plus a disputed final scope

A negotiated fee reduction and additional unpaid implementation/assurance effort consume the margin. The reserve does not make the loss disappear.

Example · USD · not an offerStandalone example
What happens when the plan breaksIllustrative contract fee of $72,000 less Selling and discovery $11,200, Delivery and assurance $60,160, Vendors and administration $3,600 produces a loss of $2,960; Contribution is before central overhead and tax. A positive budget does not guarantee available cash.ILLUSTRATIVE ECONOMICSWhat happens when the plan breaksContracted-fee budget · full collection assumed · USDUSD−20k020k40k60k80k72000Contract fee−11200Selling and discovery−60160Delivery and assurance−3600Vendors andadministration−2960Contribution lossContribution is before central overhead and tax. A positive budget does not guarantee available cash.
$72,000 in illustrative fees minus $74,960 in listed costs leaves -$2,960 before central overhead and tax. This is a loss under these assumptions.
Fees less listed costs
-$2,960
After a proposed $4,000 cash designation
-$6,960

Reserve is not an expense or an extra payment to a participant. A negative remainder means this model cannot fund that reserve from its contribution. Fees do not establish accounting recognition or cash collection.

Show the full fee and cost ledger
Illustrative fees / billings within this business boundary
ScopeQuantity × rateAmount
Defined workflow deployment1 scope × $72,000$72,000
Who could earn what, for which work, and when payment is due
Work / recipientQuantity × rateBusiness invoice / costEarned whenPayment trigger
Relationship development and stewardship
Independent steward business
24 hours × $100$2,400Authorized account work completedApproved monthly invoice
Qualified opportunity success event
Independent steward business
1 event × $400$400Agreed opportunity closes and first customer payment clearsWithin agreed period after that event
Discovery and business case
Discovery specialist business
24 hours × $110$2,640Accepted discovery evidenceMilestone invoice
Presales architecture and proof
Architecture specialist business
32 hours × $130$4,160Authorized proof deliveredMilestone invoice, whether or not a later expansion sells
Procurement and commercial close
Commercial specialist business
16 hours × $100$1,600Authorized procurement work completedApproved invoice
Accountable engagement lead
Delivery lead business
48 hours × $120$5,760Accepted delivery-management workMonthly invoice
Engineering execution
Engineering firm
520 hours × $80$41,600Agreed implementation milestones acceptedMilestone invoices
Independent assurance
Assurance specialist business
96 hours × $75$7,200Review and test evidence deliveredMilestone invoices
Operations, adoption and handover
Operations specialist business
40 hours × $90$3,600Runbook and adoption work acceptedHandover invoice
Model, cloud and project tools
Technology vendors
1 project allowance × $1,800$1,800Metered consumption or licensed periodVendor billing cycle
Permitted reusable component maintenance
Component maintainer business
1 package × $2,000$2,000Agreed maintenance and usage rights suppliedAgreed milestone
Project administration allocation
Project administration function
24 hours × $75$1,800Project-specific administration performedBudgeted as incurred
How each participant benefits—and what they owe
ParticipantPotential benefitCondition / responsibility
Independent relationship stewardKeeps its unrelated clients and earns for scoped relationship work plus a distinct success event.Authorized stewardship work and the separately defined collection milestone; no perpetual account tax.
Specialists and independent firmsReceive defined discovery, engineering, assurance or operating work packages.Each package has its own acceptance and invoice schedule; combining roles cannot duplicate the same work.
Intent as primeCoordinates delivery, holds the customer scope and retains the project contribution shown below.Must fund obligations, resolve defects and meet the accepted scope; contribution is not personal pay.
Contract route, payment terms and assumptions

Independent relationship → consent and opportunity charter → customer–Intent scope → separate role work orders.

  • Illustrative customer milestones: 40% mobilization, 30% accepted intermediate work and 30% accepted handover.
  • Supplier due dates remain separate from customer collection. The prime must fund the gap or agree different terms before work.
  • Renewal, another department and a new scope require a fresh role schedule; prior attribution alone earns nothing new.
  • All rates are teaching inputs, not local or international market medians. In particular, $75–$80 contractor inputs may understate specialist pricing and nonbillable time.
  • Trust and customer access can be valued through fixed fees, a negotiated success component, a retainer or role profit participation; logged hours are only this example’s budgeting convention.
  • The independent keeps pre-existing IP and unrelated business. The customer consents to participating firms and the opportunity boundary.
  • The scenario includes the authorized pursuit costs; it assumes no prior unpaid sales effort outside that budget.
Evidence behind this mechanism

Every amount above is a constructed teaching input. Sources explain mechanisms and constraints; they do not supply these prices, prove demand or establish Intent’s eligibility.

  • Microsoft: Manage co-sell opportunities

    Supports a customer-consent gate before sharing contact details in co-sell. Does not grant another firm ownership of an account, a universal commission or guaranteed seller help.

The independent firm keeps the customer contract

An independent firm brings its existing customer and remains prime. It purchases a bounded architecture and implementation package from Intent.

Buyer / budget holder
An independent firm that needs specialist capacity
Who pays this invoice
The independent prime pays Intent
Ledger boundary
Intent as a specialist subcontractor
Period covered
One four-week specialist work package

Customer value: The customer keeps its chosen supplier while that firm adds specialist capability. Intent’s package price is not the prime’s complete customer invoice.

The baseline assumption

Example · USD · not an offerStandalone example
Fees become contribution, not take-home payIllustrative contract fee of $15,000 less Delivery and assurance $11,000, Vendors and administration $1,000 produces contribution of $3,000; Contribution is before central overhead and tax. A positive budget does not guarantee available cash.ILLUSTRATIVE ECONOMICSFees become contribution, not take-home payContracted-fee budget · full collection assumed · USDUSD05k10k15k15000Contract fee−11000Delivery and assurance−1000Vendors and administration3000ContributionContribution is before central overhead and tax. A positive budget does not guarantee available cash.
$15,000 in illustrative fees minus $12,000 in listed costs leaves $3,000 before central overhead and tax. This is not company profit or personal income.
Fees less listed costs
$3,000
After a proposed $1,000 cash designation
$2,000

Reserve is not an expense or an extra payment to a participant. A negative remainder means this model cannot fund that reserve from its contribution. Fees do not establish accounting recognition or cash collection.

Show the full fee and cost ledger
Illustrative fees / billings within this business boundary
ScopeQuantity × rateAmount
Specialist delivery package1 scope × $15,000$15,000
Who could earn what, for which work, and when payment is due
Work / recipientQuantity × rateBusiness invoice / costEarned whenPayment trigger
Engineering
Engineering business
72 hours × $100$7,200Package milestones acceptedMilestone invoice
Architecture
Architecture business
12 hours × $150$1,800Design acceptedDesign invoice
Assurance
Assurance business
12 hours × $100$1,200Evidence deliveredReview invoice
Handover
Operations business
8 hours × $100$800Prime accepts handoverCompletion invoice
Subcontract administration
Administration function
8 hours × $75$600Administration performedAs incurred
Tools
Vendors
1 package allowance × $400$400Service consumedVendor cycle

An extra integration is absorbed without a change order

A narrow package turns into a loss when unpriced work is treated as part of the original promise.

Example · USD · not an offerStandalone example
What happens when the plan breaksIllustrative contract fee of $15,000 less Delivery and assurance $14,200, Vendors and administration $1,000 produces a loss of $200; Contribution is before central overhead and tax. A positive budget does not guarantee available cash.ILLUSTRATIVE ECONOMICSWhat happens when the plan breaksContracted-fee budget · full collection assumed · USDUSD−5k05k10k15k15000Contract fee−14200Delivery and assurance−1000Vendors and administration−200Contribution lossContribution is before central overhead and tax. A positive budget does not guarantee available cash.
$15,000 in illustrative fees minus $15,200 in listed costs leaves -$200 before central overhead and tax. This is a loss under these assumptions.
Fees less listed costs
-$200
After a proposed $1,000 cash designation
-$1,200

Reserve is not an expense or an extra payment to a participant. A negative remainder means this model cannot fund that reserve from its contribution. Fees do not establish accounting recognition or cash collection.

Show the full fee and cost ledger
Illustrative fees / billings within this business boundary
ScopeQuantity × rateAmount
Specialist delivery package1 scope × $15,000$15,000
Who could earn what, for which work, and when payment is due
Work / recipientQuantity × rateBusiness invoice / costEarned whenPayment trigger
Engineering
Engineering business
104 hours × $100$10,400Package milestones acceptedMilestone invoice
Architecture
Architecture business
12 hours × $150$1,800Design acceptedDesign invoice
Assurance
Assurance business
12 hours × $100$1,200Evidence deliveredReview invoice
Handover
Operations business
8 hours × $100$800Prime accepts handoverCompletion invoice
Subcontract administration
Administration function
8 hours × $75$600Administration performedAs incurred
Tools
Vendors
1 package allowance × $400$400Service consumedVendor cycle
How each participant benefits—and what they owe
ParticipantPotential benefitCondition / responsibility
Independent primeKeeps its customer agreement and manages the wider engagement.Its own margin and obligations are outside this package ledger.
IntentEarns a defined subcontract fee for a documented delivery boundary.Package acceptance and invoice conditions; no share of unrelated prime revenue.
SpecialistsReceive authorized engineering and review packages.Their work orders identify acceptance, due dates and remediation limits.
Contract route, payment terms and assumptions

Customer → independent prime → Intent work package → authorized specialists.

  • The prime’s customer invoice is not included here.
  • Define who may accept the package and whether any upstream acceptance is actually required.
  • Customer delays must not silently change subcontract scope or payment terms.
  • The independent firm’s unrelated clients, accounts and IP remain outside the agreement.
  • No blanket revenue share is charged merely for joining a network.
Evidence behind this mechanism

Every amount above is a constructed teaching input. Sources explain mechanisms and constraints; they do not supply these prices, prove demand or establish Intent’s eligibility.

This scenario is a proposed commercial design, not an observed industry benchmark.

A provider or integrator buys a work package

A fictional approved integrator awards a defined work package. A provider relationship alone would not create this purchase order.

Buyer / budget holder
An integrator’s delivery and procurement team
Who pays this invoice
The integrator, under its own signed work order
Ledger boundary
Intent as the integrator’s subcontractor
Period covered
One six-week subcontract

Customer value: The integrator obtains accountable specialist delivery while keeping its wider obligations. The end customer’s total deal value is deliberately outside this ledger.

The baseline assumption

Example · USD · not an offerStandalone example
Fees become contribution, not take-home payIllustrative contract fee of $36,000 less Selling and discovery $1,200, Delivery and assurance $25,200, Vendors and administration $1,000 produces contribution of $8,600; Contribution is before central overhead and tax. A positive budget does not guarantee available cash.ILLUSTRATIVE ECONOMICSFees become contribution, not take-home payContracted-fee budget · full collection assumed · USDUSD010k20k30k40k36000Contract fee−1200Selling and discovery−25200Delivery and assurance−1000Vendors andadministration8600ContributionContribution is before central overhead and tax. A positive budget does not guarantee available cash.
$36,000 in illustrative fees minus $27,400 in listed costs leaves $8,600 before central overhead and tax. This is not company profit or personal income.
Fees less listed costs
$8,600
After a proposed $2,000 cash designation
$6,600

Reserve is not an expense or an extra payment to a participant. A negative remainder means this model cannot fund that reserve from its contribution. Fees do not establish accounting recognition or cash collection.

Show the full fee and cost ledger
Illustrative fees / billings within this business boundary
ScopeQuantity × rateAmount
Approved integrator work package1 scope × $36,000$36,000
Who could earn what, for which work, and when payment is due
Work / recipientQuantity × rateBusiness invoice / costEarned whenPayment trigger
Engineering
Engineering business
180 hours × $100$18,000Milestones acceptedApproved invoice
Technical leadership
Lead business
24 hours × $150$3,600Authorized leadership deliveredMonthly invoice
Assurance
Assurance business
24 hours × $100$2,400Required evidence acceptedReview invoice
Operating handover
Operations business
12 hours × $100$1,200Handover acceptedCompletion invoice
Vendor onboarding and reporting
Coordination function
12 hours × $100$1,200Required onboarding/reporting completedApproved invoice
Tools and environments
Vendors
1 package allowance × $1,000$1,000Consumed or licensed serviceVendor cycle

Reporting and assurance requirements were underpriced

Additional lead and review time leaves too little contribution for the planned reserve and central overhead.

Example · USD · not an offerStandalone example
What happens when the plan breaksIllustrative contract fee of $36,000 less Selling and discovery $1,200, Delivery and assurance $33,200, Vendors and administration $1,000 produces contribution of $600; Contribution is before central overhead and tax. A positive budget does not guarantee available cash.ILLUSTRATIVE ECONOMICSWhat happens when the plan breaksContracted-fee budget · full collection assumed · USDUSD010k20k30k40k36000Contract fee−1200Selling and discovery−33200Delivery and assurance−1000Vendors andadministration600ContributionContribution is before central overhead and tax. A positive budget does not guarantee available cash.
$36,000 in illustrative fees minus $35,400 in listed costs leaves $600 before central overhead and tax. This is not company profit or personal income.
Fees less listed costs
$600
After a proposed $2,000 cash designation
-$1,400

Reserve is not an expense or an extra payment to a participant. A negative remainder means this model cannot fund that reserve from its contribution. Fees do not establish accounting recognition or cash collection.

Show the full fee and cost ledger
Illustrative fees / billings within this business boundary
ScopeQuantity × rateAmount
Approved integrator work package1 scope × $36,000$36,000
Who could earn what, for which work, and when payment is due
Work / recipientQuantity × rateBusiness invoice / costEarned whenPayment trigger
Engineering
Engineering business
180 hours × $100$18,000Milestones acceptedApproved invoice
Technical leadership
Lead business
64 hours × $150$9,600Authorized leadership deliveredMonthly invoice
Assurance
Assurance business
44 hours × $100$4,400Required evidence acceptedReview invoice
Operating handover
Operations business
12 hours × $100$1,200Handover acceptedCompletion invoice
Vendor onboarding and reporting
Coordination function
12 hours × $100$1,200Required onboarding/reporting completedApproved invoice
Tools and environments
Vendors
1 package allowance × $1,000$1,000Consumed or licensed serviceVendor cycle
How each participant benefits—and what they owe
ParticipantPotential benefitCondition / responsibility
Integrator primeAdds delivery capacity with agreed evidence and handover.Pays the defined work package; its own economics are not assumed.
Intent and delivery suppliersCan earn for actual procurement, reporting, engineering and assurance work.Approved scope, acceptance and invoices; partner status itself earns no modeled payment.
Contract route, payment terms and assumptions

End customer → integrator prime → Intent subcontract → delivery suppliers.

  • The example assumes an actual work order, not a referral, portal opportunity or application.
  • Acceptance and the procurement invoice clock are explicit; the integrator’s collection date does not automatically control every subcontract invoice.
  • Provider referrals, co-selling, provider-funded proof and provider-as-prime procurement are different routes.
  • Anthropic and OpenAI links show public program mechanisms only. No Intent status, award or provider commission is claimed.
Evidence behind this mechanism

Every amount above is a constructed teaching input. Sources explain mechanisms and constraints; they do not supply these prices, prove demand or establish Intent’s eligibility.

  • Anthropic: Services Track and Partner Hub

    Distinguishes practice standing from referral credit and deal protection. Does not establish any scenario fee, Intent tier, inbound work or cash entitlement.

  • OpenAI Partner Network

    Shows an official build, co-sell and delivery program. No claim of Intent enrollment, procurement approval, referral rate or awarded work.

  • AWS Marketplace: Managing disbursements

    Explains why accepted work and available cash can occur at different times. A marketplace example only; other procurement and payment routes have their own terms.

Research, evidence boundaries and diagram method

This is a proposed operating model illustrated with constructed numbers. The sources below establish program mechanisms and constraints; none establishes the scenario rates, Intent revenue, individual compensation or a guaranteed source of projects.

  • Anthropic: Services Track and Partner Hub — Distinguishes practice standing from referral credit and deal protection. Does not establish any scenario fee, Intent tier, inbound work or cash entitlement. Checked 2026-10-12.
  • OpenAI Partner Network — Shows an official build, co-sell and delivery program. No claim of Intent enrollment, procurement approval, referral rate or awarded work. Checked 2026-10-12.
  • AWS Partner Central: Creating a fund request — Separates funding approval, cash claims, invoices and credits. Eligibility and program terms apply; the customer-paid discovery example is not an AWS award. Checked 2026-10-12.
  • AWS Marketplace: Managing disbursements — Explains why accepted work and available cash can occur at different times. A marketplace example only; other procurement and payment routes have their own terms. Checked 2026-10-12.
  • Microsoft: Manage co-sell opportunities — Supports a customer-consent gate before sharing contact details in co-sell. Does not grant another firm ownership of an account, a universal commission or guaranteed seller help. Checked 2026-10-12.
  • Langfuse: Self-hosted pricing — A public example separating open-source software from paid enterprise capabilities and support. This is an offer structure, not evidence of Intent demand, profitability or transferable pricing. Checked 2026-10-12.
  • GitHub Sponsors: Sponsorships, fees and taxes — Shows a distinct sponsorship route for eligible open-source contributors. Sponsorship is not a guaranteed sale, support contract or license transfer; no sponsorship is assumed in the ledgers. Checked 2026-10-12.
  • AWS Marketplace: Channel Partner private offers — Distinguishes approved resale from ordinary vendor consumption. This does not authorize resale of an arbitrary model, API, dataset or contributor’s software. Checked 2026-10-12.

Diagram method: Cathryn Lavery’s open-source Diagram Design, using its Sankey, waterfall, bar, line, architecture and layer-stack references in Intent’s established visual style. The selected chart grammar explains the relationship; the worked examples supply the data.

Apply it to a real workflow.